9/3/2024
What Goes Into a 1-Day Epoxy Garage Floor
Diamond grind, crack repair, 100% solids epoxy, decorative flakes, urethane topcoat — here's the timeline.

Morning: diamond-grind the concrete to a CSP-3 profile. Repair cracks and spalls with epoxy mortar. Apply 100% solids basecoat, broadcast vinyl chip flakes to refusal. Afternoon: scrape excess flake, apply two-component urethane topcoat. Drive on in 24 hours.
Related services
Painters near you